Chestertons is delighted to advertise exclusively, a soon to be completed, manufacturing and logistics hub comprised of two joined warehouses and an office, being offered in Dubai Industrial City. The complex is due to be completed in January 2025. The highest specs have been used to construct a multi-use warehouse perfect for manufacturing and logistics requirements.
The site is composed of two connected warehouses, one 22,017sqft and the other 20,104sqft. The plot offers ample power with 1,000 Kilowatts, which is perfect for the use of plant & machinery. Attached to the building, is a small office and two loading docks. The site offers an attractive long lease, with options for renewal which can extend the current 29 term.
• Completion: Jan 2025
• Price: 20,000,000 AED
• Plot Area: 80,856 sqft
• BUA: 44,034 sqft
• Warehouse 1 Area: 22,017 sqft
• Warehouse 2 Area: 20,104 sqft
• Office Area: 1,927 sqft
• Lease: long lease – 29 years (2)
• Height: 12m,10.4m to eaves
• Power: 1,000 Kilowatts
• Docking Bay: Wide range and multifunction, 16m x 76m, 6 doors
The site is conveniently located 8 minutes from Jebel Ali Palm and 7 minutes from Al Maktoum airport, which is projected to be the worlds largest airport with an annual freight capacity of 12 million tons.
Dubai Industrial City is a strategically located industrial area, that welcomes both global and home-grown manufacturing and logistics companies, helping them to put down roots and grow within a supportive community. Its location offers convenient access to two major highways: Emirates Road and Mohammad Bin Zayed Road.